December 2011 – West Canal Embankment Stability Improvements Near Oasis Park
![]() |
| Owner: | Quincy – Columbia Basin Irrigation District | Contract Amount: | $ 1,995,620 |
| Project Manager: | Aaron Halling |
| Superintendent: | Michael Melton |
| Assistant P. M.: | Lisa Snell |
| Description: | The District has identified issues associated with soft soils under the West Canal in the project vicinity. Groundwater from upland sources was determined to be part of the issue and the District installed a trench drain on the west side of the canal in the winter of 2010/2011. While this has helped to intercept and remove much of the upland drain water, water continues to keep the soft soils under the canal saturated. This project aims at replacing the soft materials with freedraining materials and further collecting and removing water from beneath the canal. This project includes mobilization to the project site, demolition of the existing canal, excavation and removal of unsuitable materials, reconstruction of approximately 850 linear feet of concrete lined canal, installation and maintenance of a pump system and dikes to bypass canal water around the construction activities, removal and replacement of canal fill material (including dewatering activities), installation of a blanket and trench drain, and construction of a sump, pump, and electrical system on the east side of the West Canal. The Engineer will identify areas in which Geomembrane cutoff wall will be required for installation by Contractor. |
| Subcontractors: | Cherry City Electric, Environmental West Exploration, Apex Curb & Turf |
![]() |
![]() |
Previous Projects of the Month
May 2012 - Winlock Emergency Sink Hole Repair
- April 2012 - Drop 3 Spillway Modification
- March 2012 - Sunnyside ELIPS Schedule C
- February 2012 - Clodfelter and Locust Grove Rd
- January 2012 - Cascade Park Sanitary and Surface Water Improvements
- December 2011 - West Canal Embankment Stability Improvements Near Oasis Park
- November 2011 - Highway 35 Betterment - Season 2
- October 2011 - Stilling Basin Right Bank Improvements
- September 2011 - I-82 to Toppenish - Irrigation Phase 1b
- August 2011 - Leslie Rd. Phase II
- July 2011 - Port of Morrow