October 2011 – Stilling Basin Right Bank Improvements

 

Owner: City of Portland Contract Amount: $ 517,389.44
Project Manager: Aaron Halling
Superintendent: Sam Rhoades
Assistant P. M.: Stephen McWilliams
Description: An improvement to the Bull Run River for the Portland Water Bureau consisting of removal of existing weir, removal of a 24” concrete encased outlet pipe, and concrete armoring the bank adjacent to the removed weir with 6 foot average sized boulders. The Bull Run River is temporarily bypassed through the construction area.
Subcontractors: Cutter Construction, DSU Inc, Mob Transfers, Redmond Heavy Hauling

 