October 2011 – Stilling Basin Right Bank Improvements
| Owner: |
City of Portland |
Contract Amount: |
$ 517,389.44 |
| Project Manager: |
Aaron Halling |
| Superintendent: |
Sam Rhoades |
| Assistant P. M.: |
Stephen McWilliams |
| Description: |
An improvement to the Bull Run River for the Portland Water Bureau consisting of removal of existing weir, removal of a 24” concrete encased outlet pipe, and concrete armoring the bank adjacent to the removed weir with 6 foot average sized boulders. The Bull Run River is temporarily bypassed through the construction area. |
| Subcontractors: |
Cutter Construction, DSU Inc, Mob Transfers, Redmond Heavy Hauling |