<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Tapani Underground, Inc.</title>
	<atom:link href="http://tapaniunderground.com/feed" rel="self" type="application/rss+xml" />
	<link>http://tapaniunderground.com</link>
	<description>Tapani Underground is an Excavation and Utility Construction Company</description>
	<lastBuildDate>Wed, 22 Feb 2012 00:44:42 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.2.1</generator>
		<item>
		<title>February 2012 &#8211; Clodfelter and Locust Grove Rd</title>
		<link>http://tapaniunderground.com/clodfelter</link>
		<comments>http://tapaniunderground.com/clodfelter#comments</comments>
		<pubDate>Mon, 06 Feb 2012 17:53:47 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Featured]]></category>

		<guid isPermaLink="false">http://tapaniunderground.com/?p=1048</guid>
		<description><![CDATA[                              ]]></description>
			<content:encoded><![CDATA[<table style="width: 560px;" cellspacing="10px" cellpadding="10px" align="left">
<thead></thead>
<tbody>
<tr>
<td style="text-align: center;" valign="top" width="100%"><strong><a href="http://tapaniunderground.com/wp-content/uploads/2012/02/Clod2.jpg"><img class="aligncenter size-medium wp-image-1052" title="Clod2" src="http://tapaniunderground.com/wp-content/uploads/2012/02/Clod2-225x300.jpg" alt="" width="225" height="300" /></a></strong></td>
</tr>
</tbody>
</table>
<table style="width: 560px;" border="0" cellspacing="1" cellpadding="1" align="left">
<tbody>
<tr>
<td width="50"><strong>Owner:</strong></td>
<td width="300"> Benton County</td>
<td width="110"><strong>Contract Amount:</strong></td>
<td width="100">$3,484,532</td>
</tr>
</tbody>
</table>
<table style="width: 560px;" cellspacing="1" cellpadding="1" align="left">
<thead></thead>
<tbody>
<tr>
<td width="20%"><strong>Project Manager:</strong></td>
<td> Darren Cahoon</td>
</tr>
<tr>
<td width="20%"><strong>Superintendent:</strong></td>
<td> Jerod Esteb</td>
</tr>
<tr>
<td width="20%"><strong>Assistant P. M.:</strong></td>
<td> Loviisa Wisti</td>
</tr>
</tbody>
</table>
<table style="width: 560px;" cellspacing="1" cellpadding="1" align="left">
<thead></thead>
<tbody>
<tr>
<td valign="top" width="20%"><strong>Description:</strong></td>
<td width="460">The contract consists of the improvement of 2.6 miles of Clodfelter Road, by reconstructing a section of roadway from Bently Road to C. Williams Road (CE 1778), mld the new construction of 1.6 miles of Locust Grove Road from Clodfelter Road to Edwards Road (CE 1838). This work consists of clearing, grubbing, removing pavement (CE 1778), excavation, embankment, culvert pipe installation, crushed surfacing, paving with HMA CI y, inch PG 70-28, erosion control, bcam guardrail, pavement markings and other work.</td>
</tr>
</tbody>
</table>
<table style="width: 560px;" cellspacing="1" cellpadding="1" align="left">
<thead></thead>
<tbody>
<tr>
<td valign="top" width="20%"><strong>Subcontractors:</strong></td>
<td width="460">A&amp;B Asphalt, Frank Gurney, Granite Construction, Seubert Crushing, Stripe Rite</td>
</tr>
</tbody>
</table>
<table style="width: 560px;" cellspacing="1" cellpadding="1" align="left">
<thead></thead>
<tbody>
<tr>
<td style="text-align: center;" valign="top" width="100%"><strong><a href="http://tapaniunderground.com/wp-content/uploads/2012/02/Clod1.jpg"><img class="aligncenter size-medium wp-image-1051" title="Clod1" src="http://tapaniunderground.com/wp-content/uploads/2012/02/Clod1-300x225.jpg" alt="" width="300" height="225" /></a></strong></td>
</tr>
<tr>
<td style="text-align: center;" valign="top" width="100%"><strong><a href="http://tapaniunderground.com/wp-content/uploads/2012/02/Clod3.jpg"><img class="aligncenter size-medium wp-image-1053" title="Clod3" src="http://tapaniunderground.com/wp-content/uploads/2012/02/Clod3-257x300.jpg" alt="" width="257" height="300" /></a></strong></td>
</tr>
<tr>
<td style="text-align: center;" valign="top" width="100%"><strong><a href="http://tapaniunderground.com/wp-content/uploads/2012/02/Clod4.jpg"><img class="aligncenter size-medium wp-image-1054" title="Clod4" src="http://tapaniunderground.com/wp-content/uploads/2012/02/Clod4-300x213.jpg" alt="" width="300" height="213" /></a></strong></td>
</tr>
</tbody>
</table>
<hr />
<p>&nbsp;<br />
<ul class="lcp_catlist"><li><a href="http://tapaniunderground.com/cascade_park">January 2012 - Cascade Park Sanitary and Surface Water Improvements</a> </li><li><a href="http://tapaniunderground.com/west_canal">December 2011 - West Canal Embankment Stability Improvements Near Oasis Park</a> </li><li><a href="http://tapaniunderground.com/hwy35">November 2011 - Highway 35 Betterment - Season 2</a> </li><li><a href="http://tapaniunderground.com/stilling">October 2011 - Stilling Basin Right Bank Improvements</a> </li><li><a href="http://tapaniunderground.com/toppenish">September 2011  -  I-82 to Toppenish - Irrigation Phase 1b</a> </li><li><a href="http://tapaniunderground.com/leslie-rd-phase-ii">August 2011  -  Leslie Rd. Phase II</a> </li><li><a href="http://tapaniunderground.com/port-of-morrow">July 2011  -  Port of Morrow</a> </li></ul></p>
]]></content:encoded>
			<wfw:commentRss>http://tapaniunderground.com/clodfelter/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>January 2012 &#8211; Cascade Park Sanitary and Surface Water Improvements</title>
		<link>http://tapaniunderground.com/cascade_park</link>
		<comments>http://tapaniunderground.com/cascade_park#comments</comments>
		<pubDate>Thu, 05 Jan 2012 16:48:35 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Project of the Month]]></category>

		<guid isPermaLink="false">http://tapaniunderground.com/?p=1025</guid>
		<description><![CDATA[                              ]]></description>
			<content:encoded><![CDATA[<table style="width: 560px;" cellspacing="10px" cellpadding="10px" align="left">
<thead></thead>
<tbody>
<tr>
<td style="text-align: center;" valign="top" width="100%"><strong><a href="http://tapaniunderground.com/wp-content/uploads/2012/01/11.9.2011-Cascade-Park-003.jpg"><img class="aligncenter size-medium wp-image-1041" title="11.9.2011 Cascade Park 003" src="http://tapaniunderground.com/wp-content/uploads/2012/01/11.9.2011-Cascade-Park-003-300x225.jpg" alt="" width="300" height="225" /></a></strong></td>
</tr>
</tbody>
</table>
<table style="width: 560px;" border="0" cellspacing="1" cellpadding="1" align="left">
<tbody>
<tr>
<td width="50"><strong>Owner:</strong></td>
<td width="300"> City of Vancouver</td>
<td width="110"><strong>Contract Amount:</strong></td>
<td width="100">$1,879,200</td>
</tr>
</tbody>
</table>
<table style="width: 560px;" cellspacing="1" cellpadding="1" align="left">
<thead></thead>
<tbody>
<tr>
<td width="20%"><strong>Project Manager:</strong></td>
<td> Tod Tapani</td>
</tr>
<tr>
<td width="20%"><strong>Superintendent:</strong></td>
<td> Jamey Radford</td>
</tr>
<tr>
<td width="20%"><strong>Assistant P. M.:</strong></td>
<td> Lason McDaniels</td>
</tr>
</tbody>
</table>
<table style="width: 560px;" cellspacing="1" cellpadding="1" align="left">
<thead></thead>
<tbody>
<tr>
<td valign="top" width="20%"><strong>Description:</strong></td>
<td width="460"> Cascade Park sanitary consists of installing 9,055 Lf of 8” Sewer main, 4,236 Lf of 4” Laterals, 2,270 Lf of 6” laterals, and 36 sanitary manholes. The surface water improvements consists of installing 3 drywells, 2 sedimentation manholes, Grinding, and paving 7,605 tons of A/C. All of this work happens in The City of Vancouver’s public streets.</td>
</tr>
</tbody>
</table>
<table style="width: 560px;" cellspacing="1" cellpadding="1" align="left">
<thead></thead>
<tbody>
<tr>
<td valign="top" width="20%"><strong>Subcontractors:</strong></td>
<td width="460">Apply-a-Line, Brothers Concrete Cutting, Karvonen Sand &amp; Gravel, LC Unlimited Contractors, ORTIZ, River City Environmental, Tapani Trucking, Vancouver Paving</td>
</tr>
</tbody>
</table>
<table style="width: 560px;" cellspacing="1" cellpadding="1" align="left">
<thead></thead>
<tbody>
<tr>
<td style="text-align: center;" valign="top" width="100%"><strong><a href="http://tapaniunderground.com/wp-content/uploads/2012/01/2011-12-07_13-31-41_7.jpg"><img class="aligncenter size-medium wp-image-1033" title="Cascade 2" src="http://tapaniunderground.com/wp-content/uploads/2012/01/2011-12-07_13-31-41_7-300x168.jpg" alt="" width="300" height="168" /></a></strong></td>
</tr>
<tr>
<td style="text-align: center;" valign="top" width="100%"><strong><a href="http://tapaniunderground.com/wp-content/uploads/2012/01/2011-12-14_11-46-23_546.jpg"><img class="aligncenter size-medium wp-image-1034" title="Cascade 3" src="http://tapaniunderground.com/wp-content/uploads/2012/01/2011-12-14_11-46-23_546-300x168.jpg" alt="" width="300" height="168" /></a></strong></td>
</tr>
<tr>
<td style="text-align: center;" valign="top" width="100%"><strong><a href="http://tapaniunderground.com/wp-content/uploads/2012/01/2011-12-14_11-37-48_506.jpg"><img class="aligncenter size-medium wp-image-1032" title="Cascade 1" src="http://tapaniunderground.com/wp-content/uploads/2012/01/2011-12-14_11-37-48_506-300x168.jpg" alt="" width="300" height="168" /></a><br />
</strong></td>
</tr>
</tbody>
</table>
<hr />
<p>&nbsp;</p>
<p style="text-align: left;"><span style="font-size: 16px; font-weight: bold; color: #808080;">Previous Projects of the Month</span></p>
<ul class="lcp_catlist"><li><a href="http://tapaniunderground.com/cascade_park">January 2012 - Cascade Park Sanitary and Surface Water Improvements</a> </li><li><a href="http://tapaniunderground.com/west_canal">December 2011 - West Canal Embankment Stability Improvements Near Oasis Park</a> </li><li><a href="http://tapaniunderground.com/hwy35">November 2011 - Highway 35 Betterment - Season 2</a> </li><li><a href="http://tapaniunderground.com/stilling">October 2011 - Stilling Basin Right Bank Improvements</a> </li><li><a href="http://tapaniunderground.com/toppenish">September 2011  -  I-82 to Toppenish - Irrigation Phase 1b</a> </li><li><a href="http://tapaniunderground.com/leslie-rd-phase-ii">August 2011  -  Leslie Rd. Phase II</a> </li><li><a href="http://tapaniunderground.com/port-of-morrow">July 2011  -  Port of Morrow</a> </li></ul>
]]></content:encoded>
			<wfw:commentRss>http://tapaniunderground.com/cascade_park/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>December 2011 &#8211; West Canal Embankment Stability Improvements Near Oasis Park</title>
		<link>http://tapaniunderground.com/west_canal</link>
		<comments>http://tapaniunderground.com/west_canal#comments</comments>
		<pubDate>Tue, 06 Dec 2011 23:35:01 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Project of the Month]]></category>

		<guid isPermaLink="false">http://tapaniunderground.com/?p=947</guid>
		<description><![CDATA[                              ]]></description>
			<content:encoded><![CDATA[<table style="width: 560px;" cellspacing="10px" cellpadding="10px" align="left">
<thead></thead>
<tbody>
<tr>
<td style="text-align: center;" valign="top" width="100%"><strong><a href="http://tapaniunderground.com/wp-content/uploads/2011/12/West-Canal-AH-11.16.11-011.jpg"><img class="size-medium wp-image-946" title="West Canal AH 11.16.11 011" src="http://tapaniunderground.com/wp-content/uploads/2011/12/West-Canal-AH-11.16.11-011-300x168.jpg" alt="" width="300" height="168" /></a></strong></td>
</tr>
</tbody>
</table>
<table style="width: 560px;" border="0" cellspacing="1" cellpadding="1" align="left">
<tbody>
<tr>
<td width="50"><strong>Owner:</strong></td>
<td width="300"> Quincy – Columbia Basin Irrigation District</td>
<td width="110"><strong>Contract Amount:</strong></td>
<td width="100">$ 1,995,620</td>
</tr>
</tbody>
</table>
<table style="width: 560px;" cellspacing="1" cellpadding="1" align="left">
<thead></thead>
<tbody>
<tr>
<td width="20%"><strong>Project Manager:</strong></td>
<td>Aaron Halling</td>
</tr>
<tr>
<td width="20%"><strong>Superintendent:</strong></td>
<td> Michael Melton</td>
</tr>
<tr>
<td width="20%"><strong>Assistant P. M.:</strong></td>
<td> Lisa Snell</td>
</tr>
</tbody>
</table>
<table style="width: 560px;" cellspacing="1" cellpadding="1" align="left">
<thead></thead>
<tbody>
<tr>
<td valign="top" width="20%"><strong>Description:</strong></td>
<td width="460">The District has identified issues associated with soft soils under the West Canal<br />
in the project vicinity. Groundwater from upland sources was determined to be<br />
part of the issue and the District installed a trench drain on the west side of the<br />
canal in the winter of 2010/2011. While this has helped to intercept and remove<br />
much of the upland drain water, water continues to keep the soft soils under the<br />
canal saturated. This project aims at replacing the soft materials with freedraining<br />
materials and further collecting and removing water from beneath the<br />
canal.<br />
This project includes mobilization to the project site, demolition of the existing<br />
canal, excavation and removal of unsuitable materials, reconstruction of<br />
approximately 850 linear feet of concrete lined canal, installation and<br />
maintenance of a pump system and dikes to bypass canal water around the<br />
construction activities, removal and replacement of canal fill material (including<br />
dewatering activities), installation of a blanket and trench drain, and construction<br />
of a sump, pump, and electrical system on the east side of the West Canal. The<br />
Engineer will identify areas in which Geomembrane cutoff wall will be required for<br />
installation by Contractor.</td>
</tr>
</tbody>
</table>
<table style="width: 560px;" cellspacing="1" cellpadding="1" align="left">
<thead></thead>
<tbody>
<tr>
<td valign="top" width="20%"><strong>Subcontractors:</strong></td>
<td width="460">Cherry City Electric, Environmental West Exploration, Apex Curb &amp; Turf</td>
</tr>
</tbody>
</table>
<table style="width: 560px;" cellspacing="1" cellpadding="1" align="left">
<thead></thead>
<tbody>
<tr>
<td style="text-align: center;" valign="top" width="100%"><strong><a href="http://tapaniunderground.com/wp-content/uploads/2011/12/West-Canal-AH-11.16.11-008.jpg"><img class="size-medium wp-image-945" title="West Canal AH 11.16.11 008" src="http://tapaniunderground.com/wp-content/uploads/2011/12/West-Canal-AH-11.16.11-008-300x168.jpg" alt="" width="300" height="168" /></a></strong></td>
</tr>
<tr>
<td style="text-align: center;" valign="top" width="100%"><strong><a href="http://tapaniunderground.com/wp-content/uploads/2011/12/West-Canal-AH-11.15.11-012.jpg"><img class="size-medium wp-image-944" title="West Canal AH 11.15.11 012" src="http://tapaniunderground.com/wp-content/uploads/2011/12/West-Canal-AH-11.15.11-012-300x168.jpg" alt="" width="300" height="168" /></a></strong></td>
</tr>
</tbody>
</table>
<hr />
<p>&nbsp;</p>
<p style="text-align: left;"><span style="font-size: 16px; font-weight: bold; color: #808080;">Previous Projects of the Month</span></p>
<ul class="lcp_catlist"><li><a href="http://tapaniunderground.com/cascade_park">January 2012 - Cascade Park Sanitary and Surface Water Improvements</a> </li><li><a href="http://tapaniunderground.com/west_canal">December 2011 - West Canal Embankment Stability Improvements Near Oasis Park</a> </li><li><a href="http://tapaniunderground.com/hwy35">November 2011 - Highway 35 Betterment - Season 2</a> </li><li><a href="http://tapaniunderground.com/stilling">October 2011 - Stilling Basin Right Bank Improvements</a> </li><li><a href="http://tapaniunderground.com/toppenish">September 2011  -  I-82 to Toppenish - Irrigation Phase 1b</a> </li><li><a href="http://tapaniunderground.com/leslie-rd-phase-ii">August 2011  -  Leslie Rd. Phase II</a> </li><li><a href="http://tapaniunderground.com/port-of-morrow">July 2011  -  Port of Morrow</a> </li></ul>
]]></content:encoded>
			<wfw:commentRss>http://tapaniunderground.com/west_canal/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>November 2011 &#8211; Highway 35 Betterment &#8211; Season 2</title>
		<link>http://tapaniunderground.com/hwy35</link>
		<comments>http://tapaniunderground.com/hwy35#comments</comments>
		<pubDate>Fri, 02 Sep 2011 08:00:42 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Project of the Month]]></category>

		<guid isPermaLink="false">http://tapaniunderground.com/?p=718</guid>
		<description><![CDATA[                           ]]></description>
			<content:encoded><![CDATA[<table style="width: 560px;" cellspacing="10px" cellpadding="10px" align="left">
<thead></thead>
<tbody>
<tr>
<td style="text-align: center;" valign="top" width="100%"><strong><a href="http://tapaniunderground.com/wp-content/uploads/2011/08/Picture-375.jpg"><img class="alignnone size-medium wp-image-724" title="Picture 375" src="http://tapaniunderground.com/wp-content/uploads/2011/08/Picture-375-300x225.jpg" alt="" width="300" height="225" /></a></strong></td>
</tr>
</tbody>
</table>
<table style="width: 560px;" border="0" cellspacing="1" cellpadding="1" align="left">
<tbody>
<tr>
<td width="50"><strong>Owner:</strong></td>
<td width="300">Federal Highway Administration</td>
<td width="110"><strong>Contract Amount:</strong></td>
<td width="100">$19,687,114.80</td>
</tr>
</tbody>
</table>
<table style="width: 560px;" cellspacing="1" cellpadding="1" align="left">
<thead></thead>
<tbody>
<tr>
<td width="20%"><strong>Project Manager:</strong></td>
<td>Chad Mahoney</td>
</tr>
<tr>
<td width="20%"><strong>Superintendent:</strong></td>
<td>Jonah Sproul</td>
</tr>
<tr>
<td width="20%"><strong>Assistant P. M.:</strong></td>
<td>Randy Redinger</td>
</tr>
</tbody>
</table>
<table style="width: 560px;" cellspacing="1" cellpadding="1" align="left">
<thead></thead>
<tbody>
<tr>
<td valign="top" width="20%"><strong>Description:</strong></td>
<td width="460">The work consists of grading, drainage, base, paving, structures, and other smaller items of work.<strong>Project length: 4.906 miles</strong><strong>•Clark-Newton Section </strong>–This section begins at MP 68.6 and continues approximately 2.9 miles to the Teacup Recreational Area. Work consists of grading, drainage, base, paving, riprap, and structures. There is one single-span bridge across Clark Creek and seven large concrete box culverts for drainages crossing Hwy 35. The project will raise the grade of the road approximately four feet throughout most of the project length. No work will be done on the bridge crossing the dry Newton Creek channel at MP 68.0. The Clark Creek Sno-Park will be decommissioned and wetland restoration of the area will be part of the project.<strong>•White River Section </strong>–This section is also located on Highway 35 beginning approximately one-quarter of a mile before Forest Service Road 48 (MP 62.4) and continuing across the White River (MP 62.0) approximately 1 mile (MP 61.2), which is approximately one-half mile beyond the entrance to the Boy Scout Camp. Work consists of grading, drainage, base, paving, riprap, and structures. There is a three-span bridge across White River, a two-span bridge across Green Apple Creek (MP 62.1) and large culverts at North Mineral Creek (MP 61.8) and South Mineral Creek (MP 61.6). The project will raise the grade of the road approximately 15-feet above the current White River bridge. Debris material from previous White River events, above and below the bridge, will be used to construct embankments on both sections. Aggregate for base, paving, and rip-rap will come from the Tamarack Quarry, located near Trillium Lake, approximately 8 miles from the project site.Highway 35 is an important freight route for the State of Oregon and the Northwest. Throughout the project, traffic must be maintained at all times. Cumulative construction-caused delays to public traffic must be limited to no more than 30 minutes. Cumulative delay is the total delay caused by construction related operations along the entire project length. Temporary lane widths must accommodate large highway vehicles. During winter closures all recreational facilities must have full access. In addition, construction equipment and materials must be removed from the roadside, Sno-Parks, and parking lots.</td>
</tr>
</tbody>
</table>
<table style="width: 560px;" cellspacing="1" cellpadding="1" align="left">
<thead></thead>
<tbody>
<tr>
<td valign="top" width="20%"><strong>Subcontractors:</strong></td>
<td width="460">Apply-A-Line, Cascade Bridge, Fox Erosion Control, High Desert Aggregates, Jim Turin &amp; Sons, Malcolm Drilling, Storie &amp; Assoc., White Shield, Dirt &amp; Aggregate, Seubert Excavators, Staton, R2M2, Eagle Cap Industries</td>
</tr>
</tbody>
</table>
<table style="width: 560px;" cellspacing="1" cellpadding="1" align="left">
<thead></thead>
<tbody>
<tr>
<td style="text-align: center;" valign="top" width="100%"><strong><a href="http://tapaniunderground.com/wp-content/uploads/2011/08/Picture-333.jpg"><img class="alignnone size-medium wp-image-727" title="Picture 333" src="http://tapaniunderground.com/wp-content/uploads/2011/08/Picture-333-300x225.jpg" alt="" width="300" height="225" /></a></strong></td>
</tr>
<tr>
<td style="text-align: center;" valign="top" width="100%"><strong><a href="http://tapaniunderground.com/wp-content/uploads/2011/08/DSCN2564.jpg"><img class="alignnone size-medium wp-image-730" title="Hwy 35 - Season 2 - 4" src="http://tapaniunderground.com/wp-content/uploads/2011/08/DSCN2564-300x225.jpg" alt="" width="300" height="225" /></a></strong></td>
</tr>
<tr>
<td style="text-align: center;" valign="top" width="100%"><strong><a href="http://tapaniunderground.com/wp-content/uploads/2011/08/IMG_0376.jpg"><img class="alignnone size-medium wp-image-725" title="Hwy 35 - Season 2 - 2" src="http://tapaniunderground.com/wp-content/uploads/2011/08/IMG_0376-300x225.jpg" alt="" width="300" height="225" /></a></strong></td>
</tr>
<tr>
<td style="text-align: center;" valign="top" width="100%"><strong><a href="http://tapaniunderground.com/wp-content/uploads/2011/08/DSCN2475.jpg"><img class="alignnone size-medium wp-image-731" title="Hwy 35 - Season 2 - 3" src="http://tapaniunderground.com/wp-content/uploads/2011/08/DSCN2475-300x225.jpg" alt="" width="300" height="225" /></a></strong></td>
</tr>
</tbody>
</table>
<p>&nbsp;</p>
<p style="text-align: left;"><span style="font-size: 16px; font-weight: bold; color: #808080;">Previous Projects of the Month</span></p>
<ul class="lcp_catlist"><li><a href="http://tapaniunderground.com/cascade_park">January 2012 - Cascade Park Sanitary and Surface Water Improvements</a> </li><li><a href="http://tapaniunderground.com/west_canal">December 2011 - West Canal Embankment Stability Improvements Near Oasis Park</a> </li><li><a href="http://tapaniunderground.com/hwy35">November 2011 - Highway 35 Betterment - Season 2</a> </li><li><a href="http://tapaniunderground.com/stilling">October 2011 - Stilling Basin Right Bank Improvements</a> </li><li><a href="http://tapaniunderground.com/toppenish">September 2011  -  I-82 to Toppenish - Irrigation Phase 1b</a> </li><li><a href="http://tapaniunderground.com/leslie-rd-phase-ii">August 2011  -  Leslie Rd. Phase II</a> </li><li><a href="http://tapaniunderground.com/port-of-morrow">July 2011  -  Port of Morrow</a> </li></ul>
]]></content:encoded>
			<wfw:commentRss>http://tapaniunderground.com/hwy35/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>October 2011 &#8211; Stilling Basin Right Bank Improvements</title>
		<link>http://tapaniunderground.com/stilling</link>
		<comments>http://tapaniunderground.com/stilling#comments</comments>
		<pubDate>Tue, 02 Aug 2011 14:55:33 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Project of the Month]]></category>

		<guid isPermaLink="false">http://tapaniunderground.com/?p=743</guid>
		<description><![CDATA[                           ]]></description>
			<content:encoded><![CDATA[<p>&nbsp;</p>
<table style="width: 560px;" border="0" cellspacing="1" cellpadding="1" align="left">
<tbody>
<tr>
<td width="50"><strong>Owner:</strong></td>
<td width="300">City of Portland</td>
<td width="110"><strong>Contract Amount:</strong></td>
<td width="100">$ 517,389.44</td>
</tr>
</tbody>
</table>
<table style="width: 560px;" cellspacing="1" cellpadding="1" align="left">
<thead></thead>
<tbody>
<tr>
<td width="20%"><strong>Project Manager:</strong></td>
<td>Aaron Halling</td>
</tr>
<tr>
<td width="20%"><strong>Superintendent:</strong></td>
<td>Sam Rhoades</td>
</tr>
<tr>
<td width="20%"><strong>Assistant P. M.:</strong></td>
<td>Stephen McWilliams</td>
</tr>
</tbody>
</table>
<table style="width: 560px;" cellspacing="1" cellpadding="1" align="left">
<thead></thead>
<tbody>
<tr>
<td valign="top" width="20%"><strong>Description:</strong></td>
<td width="460">An improvement to the Bull Run River for the Portland Water Bureau consisting of removal of existing weir, removal of a 24” concrete encased outlet pipe, and concrete armoring the bank adjacent to the removed weir with 6 foot average sized boulders. The Bull Run River is temporarily bypassed through the construction area.</td>
</tr>
</tbody>
</table>
<table style="width: 560px;" cellspacing="1" cellpadding="1" align="left">
<thead></thead>
<tbody>
</tbody>
</table>
<table style="width: 560px;" cellspacing="1" cellpadding="1" align="left">
<thead></thead>
<tbody>
<tr>
<td valign="top" width="20%"><strong>Subcontractors:</strong></td>
<td width="460">Cutter Construction, DSU Inc, Mob Transfers, Redmond Heavy Hauling</td>
</tr>
</tbody>
</table>
<table style="width: 560px;" cellspacing="1" cellpadding="1" align="left">
<thead></thead>
<tbody>
<tr>
<td style="text-align: center;" valign="top" width="100%"><strong><a href="http://tapaniunderground.com/wp-content/uploads/2011/09/Stilling-Basin-3.jpg"><img class="alignnone size-medium wp-image-748" title="Stilling Basin 3" src="http://tapaniunderground.com/wp-content/uploads/2011/09/Stilling-Basin-3-300x225.jpg" alt="" width="300" height="225" /></a></strong></td>
</tr>
<tr>
<td style="text-align: center;" valign="top" width="100%"><strong><a href="http://tapaniunderground.com/wp-content/uploads/2011/09/Stilling-Basin-2.jpg"><img class="alignnone size-medium wp-image-749" title="Stilling Basin 2" src="http://tapaniunderground.com/wp-content/uploads/2011/09/Stilling-Basin-2-300x225.jpg" alt="" /></a></strong></td>
</tr>
<tr>
<td style="text-align: center;" valign="top" width="100%"><strong><a href="http://tapaniunderground.com/wp-content/uploads/2011/09/Stilling-Basin-1.jpg"><img class="alignnone size-medium wp-image-750" title="Stilling Basin 1" src="http://tapaniunderground.com/wp-content/uploads/2011/09/Stilling-Basin-1-300x225.jpg" alt="" width="300" height="225" /></a></strong></td>
</tr>
</tbody>
</table>
<hr />
<p>&nbsp;</p>
<p style="text-align: left;"><span style="font-size: 16px; font-weight: bold; color: #808080;">Previous Projects of the Month</span></p>
<ul class="lcp_catlist"><li><a href="http://tapaniunderground.com/cascade_park">January 2012 - Cascade Park Sanitary and Surface Water Improvements</a> </li><li><a href="http://tapaniunderground.com/west_canal">December 2011 - West Canal Embankment Stability Improvements Near Oasis Park</a> </li><li><a href="http://tapaniunderground.com/hwy35">November 2011 - Highway 35 Betterment - Season 2</a> </li><li><a href="http://tapaniunderground.com/stilling">October 2011 - Stilling Basin Right Bank Improvements</a> </li><li><a href="http://tapaniunderground.com/toppenish">September 2011  -  I-82 to Toppenish - Irrigation Phase 1b</a> </li><li><a href="http://tapaniunderground.com/leslie-rd-phase-ii">August 2011  -  Leslie Rd. Phase II</a> </li><li><a href="http://tapaniunderground.com/port-of-morrow">July 2011  -  Port of Morrow</a> </li></ul>
]]></content:encoded>
			<wfw:commentRss>http://tapaniunderground.com/stilling/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>September 2011  &#8211;  I-82 to Toppenish &#8211; Irrigation Phase 1b</title>
		<link>http://tapaniunderground.com/toppenish</link>
		<comments>http://tapaniunderground.com/toppenish#comments</comments>
		<pubDate>Mon, 25 Jul 2011 15:56:16 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Project of the Month]]></category>

		<guid isPermaLink="false">http://tapaniunderground.com/?p=491</guid>
		<description><![CDATA[                  ]]></description>
			<content:encoded><![CDATA[<p>&nbsp;</p>
<table style="width: 560px;" border="0" cellspacing="1" cellpadding="1" align="left">
<tbody>
<tr>
<td width="50"><strong>Owner:</strong></td>
<td width="300">Washington State Department of Transportation</td>
<td width="110"><strong>Contract Amount:</strong></td>
<td width="100">$ 415,000.00</td>
</tr>
</tbody>
</table>
<table style="width: 560px;" cellspacing="1" cellpadding="1" align="left">
<thead></thead>
<tbody>
<tr>
<td width="20%"><strong>Project Manager:</strong></td>
<td>Tod Tapani</td>
</tr>
<tr>
<td width="20%"><strong><strong>Assistant P. M.:</strong><br />
</strong></td>
<td>Lason McDaniels</td>
</tr>
<tr>
<td width="20%"><strong><strong>Superintendent:</strong></strong></td>
<td>Will Kaarto</td>
</tr>
</tbody>
</table>
<table style="width: 560px;" cellspacing="1" cellpadding="1" align="left">
<thead></thead>
<tbody>
<tr>
<td width="20%" valign="top"><strong>Description:</strong></td>
<td width="460">Work includes extending a box culvert, installing a 36&#8243; irrigation pipe, modifying existing Wapato Irrigation Project facilities, installing waterline casings for the city of Toppenish, traffic control and other work.</td>
</tr>
</tbody>
</table>
<table style="width: 560px;" cellspacing="1" cellpadding="1" align="left">
<thead></thead>
<tbody>
</tbody>
</table>
<table style="width: 560px;" cellspacing="1" cellpadding="1" align="left">
<thead></thead>
<tbody>
<tr>
<td width="20%" valign="top"><strong>Subcontractors:</strong></td>
<td width="460">Gonzales Boring and Tunneling, Apex Curb and Turf, Stripe-Rite, Brothers Concrete Cutting</td>
</tr>
</tbody>
</table>
<table style="width: 560px;" cellspacing="1" cellpadding="1" align="left">
<thead></thead>
<tbody>
<tr>
<td style="text-align: center;" width="100%" valign="top"><strong><a href="http://tapaniunderground.com/wp-content/uploads/2011/06/IMG_0296.jpg"><img class="alignnone size-medium wp-image-249" title="Topp 2" src="http://tapaniunderground.com/wp-content/uploads/2011/06/IMG_0296-300x225.jpg" alt="" width="300" height="225" /></a></strong></td>
</tr>
<tr>
<td style="text-align: center;" width="100%" valign="top"><strong><a href="http://tapaniunderground.com/wp-content/uploads/2011/06/IMG_0294.jpg"><img class="alignnone size-medium wp-image-248" title="Topp1" src="http://tapaniunderground.com/wp-content/uploads/2011/06/IMG_0294-300x225.jpg" alt="" width="300" height="225" /></a></strong></td>
</tr>
<tr>
<td style="text-align: center;" width="100%" valign="top"><strong><a href="http://tapaniunderground.com/wp-content/uploads/2011/06/IMG_0356.jpg"><img class="alignnone size-medium wp-image-250" title="IMG_0356" src="http://tapaniunderground.com/wp-content/uploads/2011/06/IMG_0356-300x225.jpg" alt="" width="300" height="225" /></a></strong></td>
</tr>
</tbody>
</table>
<hr />
<p><span style="font-size: 13px; font-weight: normal;"><span style="color: #000080;"> </span></span></p>
<p style="text-align: left;"><span style="font-size: 16px; font-weight: bold; color: #808080;">Previous Projects of the Month</span></p>
<ul class="lcp_catlist"><li><a href="http://tapaniunderground.com/cascade_park">January 2012 - Cascade Park Sanitary and Surface Water Improvements</a> </li><li><a href="http://tapaniunderground.com/west_canal">December 2011 - West Canal Embankment Stability Improvements Near Oasis Park</a> </li><li><a href="http://tapaniunderground.com/hwy35">November 2011 - Highway 35 Betterment - Season 2</a> </li><li><a href="http://tapaniunderground.com/stilling">October 2011 - Stilling Basin Right Bank Improvements</a> </li><li><a href="http://tapaniunderground.com/toppenish">September 2011  -  I-82 to Toppenish - Irrigation Phase 1b</a> </li><li><a href="http://tapaniunderground.com/leslie-rd-phase-ii">August 2011  -  Leslie Rd. Phase II</a> </li><li><a href="http://tapaniunderground.com/port-of-morrow">July 2011  -  Port of Morrow</a> </li></ul>
]]></content:encoded>
			<wfw:commentRss>http://tapaniunderground.com/toppenish/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>August 2011  &#8211;  Leslie Rd. Phase II</title>
		<link>http://tapaniunderground.com/leslie-rd-phase-ii</link>
		<comments>http://tapaniunderground.com/leslie-rd-phase-ii#comments</comments>
		<pubDate>Tue, 05 Jul 2011 16:55:00 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Project of the Month]]></category>

		<guid isPermaLink="false">http://tapaniunderground.com/?p=370</guid>
		<description><![CDATA[               ]]></description>
			<content:encoded><![CDATA[<p><span style="font-size: small;"><span style="line-height: normal;"><br />
</span></span></p>
<table style="width: 560px;" border="0" cellspacing="1" cellpadding="1" align="left">
<tbody>
<tr>
<td width="50"><strong>Owner:</strong></td>
<td width="300">City of Richland</td>
<td width="110"><strong>Contract Amount:</strong></td>
<td width="100">$ 1,052,000</td>
</tr>
</tbody>
</table>
<table style="width: 560px;" cellspacing="1" cellpadding="1" align="left">
<thead></thead>
<tbody>
<tr>
<td width="20%"><strong>Project Manager:</strong></td>
<td>Tyler Tapani</td>
</tr>
<tr>
<td width="20%"><strong>Superintendent:</strong></td>
<td>Jonah Sproul</td>
</tr>
<tr>
<td width="20%"><strong><br />
</strong></td>
<td></td>
</tr>
</tbody>
</table>
<table style="width: 560px;" cellspacing="1" cellpadding="1" align="left">
<thead></thead>
<tbody>
<tr>
<td width="20%" valign="top"><strong>Description:</strong></td>
<td width="460">Installation of new roundabout in the intersection of Clearwater Ave. and Leslie Road. Removing existing asphalt, utilities and placing structural fill for the additional width needed. Remove and replace existing concrete curb and sidewalk.</td>
</tr>
</tbody>
</table>
<table style="width: 560px;" cellspacing="1" cellpadding="1" align="left">
<thead></thead>
<tbody>
</tbody>
</table>
<table style="width: 560px;" cellspacing="1" cellpadding="1" align="left">
<thead></thead>
<tbody>
<tr>
<td width="20%" valign="top"><strong>Subcontractors:</strong></td>
<td width="460">A&amp;B Asphalt, Granite Construction, West Coast Road Recycling, Baisch Vegetation Management, North Country Construction, Sierra Electric, Quality Sign Service</td>
</tr>
</tbody>
</table>
<table style="width: 560px;" cellspacing="1" cellpadding="1" align="left">
<thead></thead>
<tbody>
<tr>
<td style="text-align: center;" width="100%" valign="top"><strong><br />
</strong></td>
</tr>
<tr>
<td style="text-align: center;" width="100%" valign="top"><strong><br />
</strong></td>
</tr>
<tr>
<td style="text-align: center;" width="100%" valign="top"><strong><br />
</strong></td>
</tr>
</tbody>
</table>
<hr />
<p><span style="font-size: 13px; font-weight: normal;"><span style="color: #000080;"> </span></span></p>
<p style="text-align: left;"><span style="font-size: 16px; font-weight: bold; color: #808080;">Previous Projects of the Month</span></p>
<ul class="lcp_catlist"><li><a href="http://tapaniunderground.com/cascade_park">January 2012 - Cascade Park Sanitary and Surface Water Improvements</a> </li><li><a href="http://tapaniunderground.com/west_canal">December 2011 - West Canal Embankment Stability Improvements Near Oasis Park</a> </li><li><a href="http://tapaniunderground.com/hwy35">November 2011 - Highway 35 Betterment - Season 2</a> </li><li><a href="http://tapaniunderground.com/stilling">October 2011 - Stilling Basin Right Bank Improvements</a> </li><li><a href="http://tapaniunderground.com/toppenish">September 2011  -  I-82 to Toppenish - Irrigation Phase 1b</a> </li><li><a href="http://tapaniunderground.com/leslie-rd-phase-ii">August 2011  -  Leslie Rd. Phase II</a> </li><li><a href="http://tapaniunderground.com/port-of-morrow">July 2011  -  Port of Morrow</a> </li></ul>
]]></content:encoded>
			<wfw:commentRss>http://tapaniunderground.com/leslie-rd-phase-ii/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>July 2011  &#8211;  Port of Morrow</title>
		<link>http://tapaniunderground.com/port-of-morrow</link>
		<comments>http://tapaniunderground.com/port-of-morrow#comments</comments>
		<pubDate>Fri, 01 Jul 2011 20:52:08 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Project of the Month]]></category>

		<guid isPermaLink="false">http://tapaniunderground.com/?p=267</guid>
		<description><![CDATA[               ]]></description>
			<content:encoded><![CDATA[<p><span style="font-size: small;"><span style="line-height: normal;"><br />
</span></span></p>
<table style="width: 560px;" border="0" cellspacing="1" cellpadding="1" align="left">
<tbody>
<tr>
<td width="50"><strong>Owner:</strong></td>
<td width="300">Port of Morrow</td>
<td width="110"><strong>Contract Amount:</strong></td>
<td width="100">$ 2,883,567</td>
</tr>
</tbody>
</table>
<table style="width: 560px;" cellspacing="1" cellpadding="1" align="left">
<thead></thead>
<tbody>
<tr>
<td width="20%"><strong>Project Manager:</strong></td>
<td>Darren Cahoon</td>
</tr>
<tr>
<td width="20%"><strong>Assistant P.M.:</strong></td>
<td>Josiah Thomas</td>
</tr>
<tr>
<td width="20%"><strong><strong>Superintendent:</strong></strong></td>
<td>Nathan Kaski</td>
</tr>
</tbody>
</table>
<table style="width: 560px;" cellspacing="1" cellpadding="1" align="left">
<thead></thead>
<tbody>
<tr>
<td width="20%" valign="top"><strong>Description:</strong></td>
<td width="460">Excavate and embank sand borrow. Install 1900 feet of concrete track. Install yard air pipe. Furnish and install a modular office building and a steel building.</td>
</tr>
</tbody>
</table>
<table style="width: 560px;" cellspacing="1" cellpadding="1" align="left">
<thead></thead>
<tbody>
</tbody>
</table>
<table style="width: 560px;" cellspacing="1" cellpadding="1" align="left">
<thead></thead>
<tbody>
<tr>
<td width="20%" valign="top"><strong>Subcontractors:</strong></td>
<td width="460">American Fencing, Balfour Beatty Rail, Fox Erosion Control, GN Northern, Tapani Trucking, Prime Cut Construction, Rob Merriman Plumbing</td>
</tr>
</tbody>
</table>
<p>&nbsp;</p>
<table style="width: 560px;" cellspacing="1" cellpadding="1" align="left">
<tbody>
<tr>
<td style="text-align: center;" width="100%" valign="top"><a href="http://tapaniunderground.com/wp-content/uploads/2011/07/Port-of-Morrow-2.jpg"><img class="alignnone size-medium wp-image-689" title="Port of Morrow 2" src="http://tapaniunderground.com/wp-content/uploads/2011/07/Port-of-Morrow-2-300x200.jpg" alt="" width="300" height="200" /></a><strong> </strong></td>
</tr>
<tr>
<td style="text-align: center;" width="100%" valign="top"><strong><a href="http://tapaniunderground.com/wp-content/uploads/2011/07/Port-of-Morrow-1.jpg"><img class="alignnone size-medium wp-image-688" title="Port of Morrow 1" src="http://tapaniunderground.com/wp-content/uploads/2011/07/Port-of-Morrow-1-300x200.jpg" alt="" width="300" height="200" /></a> </strong></td>
</tr>
<tr>
<td style="text-align: center;" width="100%" valign="top"><strong> <a href="http://tapaniunderground.com/wp-content/uploads/2011/07/Port-of-Morrow-3.jpg"><img class="alignnone size-medium wp-image-690" title="Port of Morrow 3" src="http://tapaniunderground.com/wp-content/uploads/2011/07/Port-of-Morrow-3-300x200.jpg" alt="" width="300" height="200" /></a></strong></td>
</tr>
</tbody>
</table>
<hr />
<p><span style="font-size: 13px; font-weight: normal;"><span style="color: #000080;"> </span></span></p>
<p style="text-align: left;"><span style="font-size: 16px; font-weight: bold; color: #808080;">Previous Projects of the Month</span></p>
<ul class="lcp_catlist"><li><a href="http://tapaniunderground.com/cascade_park">January 2012 - Cascade Park Sanitary and Surface Water Improvements</a> </li><li><a href="http://tapaniunderground.com/west_canal">December 2011 - West Canal Embankment Stability Improvements Near Oasis Park</a> </li><li><a href="http://tapaniunderground.com/hwy35">November 2011 - Highway 35 Betterment - Season 2</a> </li><li><a href="http://tapaniunderground.com/stilling">October 2011 - Stilling Basin Right Bank Improvements</a> </li><li><a href="http://tapaniunderground.com/toppenish">September 2011  -  I-82 to Toppenish - Irrigation Phase 1b</a> </li><li><a href="http://tapaniunderground.com/leslie-rd-phase-ii">August 2011  -  Leslie Rd. Phase II</a> </li><li><a href="http://tapaniunderground.com/port-of-morrow">July 2011  -  Port of Morrow</a> </li></ul>
]]></content:encoded>
			<wfw:commentRss>http://tapaniunderground.com/port-of-morrow/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>

